Background

Pipeline Installation and Maintenance

Pipeline Installation and Maintenance


  • Concept development, Engineering and Planning.
  • Equipment rig up and mobilisation.
  • Pre-trenching.
  • Hold back anchor installation.
  • Establishment of pull winch and beach pull cable deployment.
  • Pipeline Buoyancy Manufacture, Attachment and Removal.
  • Beachpull operations / Shallow Water Pipelay.
  • Backfilling.
  • Pipeline Post trenching if required.
Pipeline Post Trenching

Marconserv maintains a solid inventory of equipment for re-laying pipelines and is constantly upgrading. The key to efficient trenching operations lies in providing a well-designed nozzle skid with an effective deployment and recovery system and efficiently delivering large volumes of high-pressure water and air.

  • Effective deployment barge of DSV with efficient mooring system and handling crane.
  • Jet sled configured specifically for the pipeline to be jetted..
  • High volume / pressure water, air distribution system.